Solid Fuel Boilers

Indeck Keystone Solid Fuel Boilers

Indeck Keystone Energy has been a trusted provider of solid fuel boilers since 1949. With over 300 installations nationwide and worldwide, we specialize in servicing the needs of customers requiring large capacity steam generation. Our boilers have the capability to burn multiple and unique fuels, offering versatility and efficiency. Whether it’s coal, wood, rice hulls, tires, municipal waste, blast furnace gas, refinery gas, oil, bagasse, or natural gas, our systems can handle it all. Our steam capacity ranges up to 600,000 pounds per hour, catering to a wide range of demands.

Depending on the specific requirements and fuel used, our boilers can deliver steam capacities ranging from 25,000 to 500,000 pounds per hour. Join the countless customers who trust Indeck Keystone Energy for their solid fuel boiler needs.

Solid Fuels Fired Include:

  • Coal and Lignite
  • Wood and Bark
  • Bagasse
  • MSW (Municipal Solid Waste)
  • RDF (Refuse Derived Fuel)
  • Tires
  • Agricultural Wastes
Solid Fuel Boiler
Solid Fuel Boiler

Projects

Cold Climate Heating and Power - New Coal Fired Boiler Using Indeck Travagrate® Stoker

Indeck Keystone Energy was awarded a contract for the supply of two superheated 120,000 PPH / 600 PSIG Coal Fired boilers with auxiliary equipment for field erection. These systems will be installed for central heat and power at a subarctic climate location in North America . The boilers are being furnished in two phases in order to replace existing 1950’s units without impeding the heating requirements of the plant. The boiler and auxiliary equipment have been delivered and started up successfully.

Indeck is using its time tested and proven Travagrate® stoker with reciprocating feeders and over fire air and ash re-inject system for lower emissions and increased efficiency. The stoker is completely assembled and match marked prior to disassembly to help the field to reassemble. Feeders and stoker drive unit are fabricated, assembled and tested prior to shipment. This is all done in our shop in Erie, PA.

Coal Fired Boiler For Heating Plant

Indeck Keystone Energy was awarded a contract for the supply of an 80,000 PPH / 750 PSIG stoker fired coal boiler with auxiliary equipment for field erection. The system is installed at a university heating plant as part of an emissions compliance upgrade replacing boilers from the 1950’s. The boiler surpassed all performance and emission goals. The boiler and auxiliary equipment have been delivered and started up successfully.

Indeck Boiler Models